![]() Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.Ĭontrol equipment means equipment necessary for the setting and/or unsetting of an immobilizer. Examples of a water control structure may include a bridge, culvert, dam, embankment, ford (if above grade), retaining wall, and weir. Water control structure means a structure within, or adjacent to, a water, which intentionally or coincidentally alters the hydraulic capacity, the flood elevation resulting from the two-, 10-, or 100-year storm, flood hazard area limit, and/or floodway limit of the water. ![]() PJM Control Area means the Control Area recognized by NERC as the PJM Control Area. Traffic control signal means a device, whether manually, electrically, or mechanically operated, by which traffic is alternately directed to stop and to proceed. Qwest's Access Tandem Switches are also used to connect and switch traffic between and among Central Office Switches within the same LATA and may be used for the exchange of local traffic.Īerodrome control service means air traffic control service for aerodrome traffic Vapor control system means a system that limits or prevents release to the atmosphere of organic compounds in the vapors displaced from a tank during the transfer of gasoline.Īccess Tandem Switch is a Switch used to connect End Office Switches to interexchange Carrier Switches. ![]() Air traffic control service means a service provided for the purpose of:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |